Requirements:
Migrate all vm's from Cluster 1 to Cluster2 in vcenter 5.5.
Cluster1
There are 8 network adapter's of 1Gbps on all host from Cluster1
2 - are using for vmotion
2 - are using for vmanagment
4 - are using for VMNetwork
All hosts are connected with DV-switch1
Cluster2
There are 2 network adapter's of 10 Gbps on all host from Cluster2
Vmotion, vmanagment and VMNetwork all are running on these two 10 Gbps
All hosts connected to this Cluster2 on DV-switch2
LACP is enabled on DV-switch2 at vcenter level and physical switch end.
Vlans are same for VMNetwork configured on both DV-switch.
Please suggest best solutions to hot migrations from Cluster1 to Cluster2?